28.07.2014

 

Heavy load transport during the night

Last drilling rig leaves the FAIR construction site


Convoi exceptionnel: The drilling rig will be transported on a low-loading truck.

The logistic area for the FAIR construction site is being prepared. Photos: Markus Bernards for FAIR

The last rotary drilling rig is being prepared to be transported away from the FAIR construction site during the coming night. At the same time, south of GSI parking area, a logistic area („BE-1“) for the FAIR construction site undergoes tar work. It will serve as a parking area for site and courier service vehicles.




To top

 
(c) 2017 FAIR
  •  Home|
  • Contact